Saturday, 18 April 2026

Peco Plan 2: BR Branch Line Progress Update April 2026

It's been a while since I last posted - but some more progress has been made, albeit not as much as I'd have liked.

 

 

First I replaced the cheap 12V power supply with a Gaugemaster WM1 - this is a 16V AC supply which splits into AC and DC feeds which powers the blocksignalling CDU nicely!

I then replaced the PWM controller entirely as I wasn't happy with the slow speed performance and didn't want to faff about adding in diodes etc to try and improve it. I've since obtained a handheld AGW-built Graham Farish controller to replace the W in the picture above (which lives on my shelf OO layout).



In the above I have fitted the magnets for the Dapol Easi-shunt couplings... so you know what's coming next.



Fitting them to all the rolling stock of course - of which I have ordered a few more pieces. I decided I needed some plank wagons, so I have a 3, 5 and 7 plank coming in BR grey with some 3D printed loads to add variety. I've also ordered an insulted van and a conflat.

 I'll need to order some more easi-shunt couplings to say the least! And Dapol conversions packs to replace the Peco and GF coupling pockets. 

 

No comments:

Post a Comment