I've been thinking about the operating schedule recently and realised I had too much stock. There's no way on earth that a small BLT layout like this needed 5 steam engines as well as a DMU and Class 22 diesel.
So some rationalisation has taken place -
![]() |
| Pannier and Autotrailer |
![]() |
| Standard 3MT with a branch freight working |
![]() |
| Bringing out the empties from the yard |
![]() |
| A local suburban train from the junction station - I think these coaches need some weights added to them for better performance |
![]() |
| Sadly replaced in later years by a Class 121 single |
![]() |
| Finally, a class 22 has replaced the 3MT post-67 for what dwindling freight working remains |
And that's all it really needs for a good hour long running session, with plenty of shunting activity.
Some other activity on the layout this week - I'm not getting the best slow control from the Gaugemaster model W and I think it has something to do with the 16v AC supply being shared across the CDU and sound board. So I've ordered a variable 2 amp PSU to see if the PWM controller I had previously can make a return - testing on 12V it's way too fast for the steam engines, so I'm hoping a 6-9v input will deliver better control.
After that is done (which will require opening back up the baseboard), it's time to get stuck into the scenics now that the operations are nailed down.
The rolling stock which was removed has had it's rapido couplings refitted and will go into storage for a future bigger layout.





